SEARCH CONTENT

You are looking at 1 - 10 of 31,851 items :

  • Geosciences x
Clear All
Sovereignty, Materiality, and the Territorial Imagination
Barrieren und Chancen für den Zugang zu Lebensmitteln in deutschen Städten
Lokale Praktiken, Technologien und Emotionalitäten im kommunalpolitischen Dialog mit Muslimen
Ressourcen nachhaltiger Landschaftsentwicklung
Demokratiefeindliche Entwicklungen und ihre räumlichen Kontexte
Financing the Global Land Rush
Archiwum Fotogrametrii, Kartografii i Teledetekcji

Abstract

Energy crises is the one of the major problem that was faced by Pakistan in order to overcome on that crises Pakistan need to be developed and improvement in energy sector, Throughout in the country the demand of water and power increasing day by day therefore hydropower project are the need of the hour in Pakistan. Before initiation of any project EIA play important role in evaluating the nature of the project on different factors. Government of Pakistan planned one of the mega hydropower project diamer basha dam was planned in Gilgit Baltistan. It was intended to conduct the research work on describing significant factors so as to evaluate the influence of the project on them and develop guidelines for environmental assessment for these factors. To find out these significant factors the methodology was adapted to conducting field investigation. Besides to assess the relevant impact questionnaires were developed. Finally, in order to reduce the negative impact of the project on the predefine factor mitigation measure was suggested. It is anticipated that this study work support in developing structure work to be executed as mitigation measures and boost the advantages of the project.

Eine räumliche Analyse der »Movimiento por la Paz con Justicia y Dignidad« in Mexiko

Abstract

This study presents the estimated remaining quantity of overburden material (topsoil, completely to highly weathered rock) and remaining geological reserve at Sibanyis Quarry, Kuching after the quarry has been operated for years. Desktop study including literature search was carried out prior field investigation. Three boreholes together with latest topographical and detail survey was conducted to obtain the latest data at Sibanyis Quarry, Kuching. Based on this Geological Reconciliation Study, the estimated total remaining geological rock reserve is 40,022,767 metric tons, and the weathered rock and top soil are 2,159,688 BCM and 1,247,697 BCM respectively. The assumptions that are taken into consideration are top soil thickness of 11m, weathered rock thickness of 15m and rock density of 2.64 mt/m3.