The framework for building in China B 1 Project control in China Hans-Peter Holler B 1.1 Legal bases The Chinese building industry is on its way to becoming one of the most highly regulated sectors. Even though there is nowhere near as much monitoring and control as in telecommunications, for ex- ample, a bewilderingly large number of laws, procedures, approval procedures and tests relating to erecting and running buildings have to be taken into account in the property sphere. Engineers, archi- tects, consultants, experts and building companies must be

4 Process Perspective 4.1 Project Controlling 4.1.1 Schedule Performance Index (SPI) Analytical Question How good is the time-efficiency of the project so far? What is the ratio (at a milestone or review- deadline) between the value of work completed and the value of work planned in a project, as an indicator of the achieved progress? Definition Earned Value · 100 Planned Value Where: Earned Value = Budgeted Cost of the Work Performed (BCWP) Planned Value = Budgeted Cost of the Work Scheduled (BCWS) The SPI is expressed in percentage. When the

In the past project controllers were regarded much as “building accountants” or as “protocol clerks”, and the German guidelines for planning services (HOAI §31) underlined this with their heavily simplified, for- malised definitions. Modern project controlling is, by contrast, an active management task with the project controller situated between investor, developer, planning team, building contractor and the final user. The aspects discussed below apply in general, not just to the specifics of managing projects for the elderly, and are important for an overall

coordinate supplementary damping controller for HVDC and SVC were then designed based on projective control principle. The criterion of synthetic residue is adopted in choosing the proper input wide area signals. Eigenvalue analysis and time domain simulations were performed on a two-area system and the results demonstrated the effectiveness of the proposed controller. KEYWORDS: wide area measurement system, projective control, synthetic residue criterion, test signal I. INTRODUCTION In China large distance between power generation and load center is patent. When

Betriebswirtschaftliche Grundlagen und Umsetzung mit SAP®
Series: Basics
FREE ACCESS

Pecco Becker Project Control Entwurfsidee Bert Bielefeld - Sebastian El Khouli Birkhäuser BaselBIRKHÄUSER BASEL Pecco Becker Project Control

). Project Management in the OSCE. Vienna: Organization for Security and Co-operation in Europe, OSCE Secretariat. Retrieved from http://www.osce.org/secretariat/70693?download=true U.S. Department of Energy. (2004). Project Control Handbook. U.S: Department of Energy. Retrieved from https://www.slideshare.net/haroldtaylor1113/project-control-handbook U.S. Department of Justice. (2015). Information Technology (IT) Project Manager Guide. US: Department of Justice. Retrieved from https://www.justice.gov/jmd/file/705781/download U.S. Department of Transportation. (2016

the S-curve , International Journal of Project Management, 2001, No. 23, 215–222. [5] Corovic R., Why EVM is not good for schedule performance analyses (and how it could be…) , The Measurable News, www.earnedschedule.com/papers , 2006–2007. [6] Czarnigowska A., Earned value method as a tool for project control , Budownictwo i Architektura , 2008, No. 3, 15–32. [7] Dolezal J., Projektovy management. Komplexne, prakticky a podle svetovych standardu , Grada Publishing, Praha 2016. [8] Evensmo J., Karlsen J.T., Earned value based forecasts – some pitfalls , AACE