Design and Build Procurement System – Contractor Selection

A. Lesniak
  • Division of Construction Technology and Management, Cracow University of Technology, Kraków, Poland
  • Email:
/ E. Plebankiewicz
  • Division of Construction Technology and Management, Cracow University of Technology, Kraków, Poland
  • Email:
/ K. Zima
  • Division of Construction Technology and Management, Cracow University of Technology, Kraków, Poland
  • Email:
Published Online: 2012-12-28 | DOI: https://doi.org/10.2478/v.10169-012-0025-9

Abstract

One of the contract awarding systems in public sector in Poland is the Design & Build system. In this system, a client concludes a contract agreement with only one company, a contractor, in order to carry out both design and construction of works. While deciding on this form of delivery of a public project, the client is obliged to conduct a single proceeding aiming to select the contractor. In this paper, public works contracts awarded in the D&B system in Poland are analysed, whilst attention was put on the contracting modes and assessment criteria. The results are assessed against the experience of other countries and recommended methods for selection of the Design and Build contractor.

Keywords : Design and Build system; public projects; contractor selection

References

  • 1. K.R. Molenaar, A.D. Songer, M. Barash, Public-sector design/build evolution and performance, Journal of Management in Engineering, March/April 1999, s. 54-62.Google Scholar

  • 2. K.R. Molenaar, D.D. Gransberg, Design-Builder selection for small highway projects, Journal of Management in Engineering, October, 214-22, 2001.Google Scholar

  • 3. S.O. Ojo, O. Aina, A.Y. Adeyemi, A comparative analysis of the performance of traditional contractingand design-build procurements on client objectives in Nigeria, Journal of Civil Engineering and management, 17(2), 227-233, 2011.Web of ScienceGoogle Scholar

  • 4. K.J. Potter, V. Sanvido, Implementing a design/build prequalification system, Journal of Management in Engineering, May/June 30-34, 1995.Google Scholar

  • 5. V. Ireland, The role of managerial action in the cost, time and quality performance of high-risecommercial building projects, Construction Management and Economics, 3, 59-87, 1985.Google Scholar

  • 6. The Act of 29 January 2004 - Public Procurement Law (Journal of Laws of 2010, No. 113, item. 759; No. 161, item. 1078 and No. 182, item 1228 and of 2011, No. 5, item 13, No. 28, item 143 and No. 87 item 484).Google Scholar

  • 7. Construction Law (Journal of Laws of 2006 No. 156, item. 1118, as amended).Google Scholar

  • 8. The Public Procurement Bulletin, www.uzp.gov.plGoogle Scholar

  • 9. K.R. Molenaar, A.D. Songer, Model for Public-sector design/build project selection, Journal of Construction Engineering and Management, November/December, 467-479, 1998.Google Scholar

  • 10. E. Plebankiewicz, Contractor prequalification model using fuzzy sets, Journal of Civil Engineering and Management, 15(4), s. 377-385, 2009.Web of ScienceGoogle Scholar

  • 11. A. Kosecki, Construction project management as a service regulated by contract [in Polish], cz.I, Przeglad Budowlany, 3, 36-39, cz.II, Przeglad Budowlany, 4, s. 9-12, 2003.Google Scholar

  • 12. A. Kosecki, E. Plebankiewicz, Formulating criteria for prequalification of construction contractors [in Polish], Konferencja Inzynieria Procesów Budowlanych, Wisła, 189-196, 2009.Google Scholar

  • 13. E. Palaneeswaran, M. Kumaraswamy, Contractor selection for design/build projects, Journal of Construction Engineering and Management, 126, 5, 331-339, 2000.Google Scholar

  • 14. Pre-qualification Of Design-Build Entities Seeking To Bid On Community And School Facilities Department Of Industrial Relations, www.dir.ca.govGoogle Scholar

  • 15. Pre-qualification Of Design-Build Entities Seeking To Bid on transit Projects, Department of Industrial Relations.Google Scholar

  • 16. E. Plebankiewicz, Simple prequalification models, Archives of Civil Engineering, 56, 4, 235-351, 2010.Google Scholar

  • 17. E. Palaneeswaran, M. Kumaraswamy, Web-based client advisory decision support system for designbuilder prequalification, Journal of Computing in Civil Engineering, 19, 1, 69-82, 2005.Google Scholar

  • 18. K. Al-Reshaid, N. Kartman, Design-build prequalification and tendering approach for public projects, International Journal of Project Management, 23, 4, 309-320, 2005.Google Scholar

  • 19. Qualifications Based Selection of Contractors, AGC of America Project Delivery Committee QBS Working Group, August, 2009.Google Scholar

  • 20. S. Christodoulou, F.H.(Bud) Griffis, L. Barrett, M. Okungbowa, Qualifications-Based Selection of Professional A/E Services, Journal of Management in Engineering, 34-41, April 2004.Google Scholar

  • 21. O.G. Manoliadis, J.P. Pantouvakis, S.E. Christodoulou, Improving qualifications-based selection by use of the fuzzy Delphi method, Construction Management and Economics, 27, 4, 373-384, 2009.Google Scholar

  • 22. M. Wardani, J.I. Messner, M.J. Horman, Comparing procurement methods for design-build project, Journal of construction Engineering and Management, 2006.Google Scholar

About the article

Received: 2012-02-08

Revised: 2012-11-05

Published Online: 2012-12-28

Published in Print: 2012-12-01


Citation Information: Archives of Civil Engineering, ISSN (Online) 1230-2945, DOI: https://doi.org/10.2478/v.10169-012-0025-9.

Export Citation

© Polish Academy of Sciences. This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License. BY-NC-ND 3.0

Comments (0)

Please log in or register to comment.
Log in